Project Cost Estimator
Estimate a project price in a minute. Enter the hours, your hourly rate, materials, and other costs, plus a contingency for surprises, to see the labour cost, the subtotal, and your total estimate. The result updates as you type.
Your project
Your result
Enter your numbers to see the result.
Worked Example
Example, with the default numbers. The project takes 120 hours at $75 an hour, so labour costs 120 times $75, which is $9,000. Materials cost $2,500 and other costs are $500, so the subtotal is $9,000 plus $2,500 plus $500, which is $12,000. A 10% contingency adds $1,200, so the total estimate is $13,200. That works out to $110.00 per hour, with labour at 68.18% of the total and materials at 18.94%.
Common Mistakes
Leaving out the contingency. Projects almost always run into something unexpected, a price rise, extra work, or a delay. A 10% contingency on a $12,000 subtotal is $1,200, and quoting without it means that $1,200 comes out of your own pocket.
Charging your rate but forgetting your costs. Your hourly rate is not pure profit. Materials, travel, software, and other costs sit on top of labour, so add them in before you quote, or the job pays less than your rate.
Underestimating the hours. Optimistic hour counts are the most common estimating error. If past jobs took 20% longer than planned, add that buffer to the hours before you multiply by the rate.
Quoting the subtotal as the price. The subtotal leaves out the contingency. Quote the total estimate, $13,200 in this example, not the $12,000 subtotal, so surprises are already covered.
Related Tools
Turn the estimate into a bill with the Invoice Generator, check your margin with the Profit Margin Calculator, work out weekly pay with overtime using the Overtime Pay Calculator, or browse every calculator in the Tools hub.
Frequently Asked Questions
How is a project cost estimated?
Multiply the estimated hours by the hourly rate for the labour cost, add materials and other costs for the subtotal, then add the contingency percentage. For 120 hours at $75, plus $2,500 of materials and $500 of other costs, the subtotal is $12,000, and a 10% contingency brings the total to $13,200.
What is a contingency in project costing?
A contingency is a percentage added to cover unexpected costs, usually 5% to 15%. It protects you against price rises, extra work, and delays that were not in the original plan.
What counts as other costs?
Anything that is not labour or materials: travel, permits, software licences, subcontractors, equipment hire, and delivery charges. Put them in the other costs box so the estimate covers the whole job.
How do I pick an hourly rate?
Start from the rate you need to cover your costs and earn your target income, then check what others charge for similar work in your area. The effective cost per hour in the results shows what the client really pays per hour once materials and contingency are included.
Is this the same as a quote?
It is the basis for one. The total estimate is a fair price to quote, but a formal quote should also list what is included, what is not, payment terms, and how long the price is valid for.